Provided roadway design, permitting, and FDOT compliance services for improvements within the S.R. 25, S.R. 17, S.R. 37, S.R. 33, S.R. 35, S.R. 60, S.R. 400, S.R. 539, S.R. 540, S.R. 542, S.R. 544, S.R. 546, S.R. 549, S.R. 555, S.R. 557, S.R. 600, S.R. 655, and U.S. 98 corridors. Services included design and evaluation of roadway and site access improvements, turn lanes, auxiliary and deceleration lanes, driveway connections, median openings, intersection modifications, curb and gutter, sidewalks and ADA facilities, signing and pavement markings, stormwater conveyance and management systems, utility crossings and adjustments, and maintenance of traffic.
Performed field reviews and construction-phase compliance services for permitted improvements within FDOT rights-of-way, including review of roadway geometry, drainage, driveway connections, pavement restoration, signing and striping, MOT, and associated materials and compaction testing. Managed CEI-style documentation, including delivery tickets, daily reports, testing records, photographic documentation, punch-list items, permit closeout, and final certification. Worked directly with FDOT throughout permitting, construction inspection, corrective work, and closeout to document compliance and facilitate acceptance of roadway corridor improvements.