CarterKaye Engineering

Local Area Program (LAP) – Avenue C SW and 2nd Street SW, Complete Street Project

City of Winter Haven
Environmental, Government, Stormwater, Transportation
Engineer of Record: Kriss Y. Kaye, P.E.

CarterKaye personnel provided project management and engineering services for the Avenue C SW and 2nd Street SW Complete Street project (FPID 440276-1-58-01), an approximately $1.45 million FDOT Local Agency Program (LAP) corridor improvement for the City of Winter Haven. Kriss Y. Kaye, PE, CFM served as the original Project Manager, and CarterKaye subsequently served as the City’s Owner’s Representative during construction and provided design of the corridor lighting. Avenue C SW, a City-maintained collector roadway, was modified to provide two 11-foot travel lanes intended to enhance safety and encourage reduced vehicle speeds. Improvements included striped and unstriped on-street parking, continuous 5-foot sidewalks, upgraded stormwater infrastructure, landscaping and street trees, and underground conduit to accommodate future fiber and/or street lighting. Along the north side of Avenue C SW from First Street South to Fifth Street SW, approximately 1,725 feet of 8-foot concrete and asphalt multi-use path was constructed. Existing 5- and 6-foot sidewalks along the south side were reconstructed. The completed corridor integrated roadway, pedestrian, multimodal, stormwater, landscape and lighting-related improvements within an established municipal right-of-way.

Ready to get started?

Let CarterKaye take your next project from idea to reality.
Carter and Kaye Engineering, LLC
We are located in downtown Winter Haven, Florida across Central Park, across from the City's library and just southwest of the  Chamber of Commerce, southwest of the intersection of Avenue B N.W. and 5th Street N.W. 
Copyright © 2026 Carter and Kaye Engineering, LLC. All rights reserved.